Psychrometrics is the science behind Structural Drying And Dehumidification, and skipping it usually means either under-drying a space or leaving equipment running far longer than necessary.
We calculate air mover and dehumidifier placement using psychrometric formulas, not a flat per-room equipment count.

We calculate drying requirements using temperature and humidity data, not a flat per-room rule.
Our Gallagher, WV jobs run commercial LGR equipment sized to the calculated moisture load.
Thermal imaging cameras reveal moisture patterns behind walls and under flooring that aren't visible to the eye.
Daily logs give you and your insurer verifiable proof of progress, not a technician's word.
Structural drying is a distinct phase with its own methodology, separate from initial extraction, and here's how our Gallagher, WV crews run it.

We calculate temperature, humidity, and grain depression readings to build the drying plan.
Thermal cameras scan walls, ceilings, and flooring to reveal moisture invisible to the naked eye.
We position air movers to create directed airflow across wet surfaces based on the assessment.
Documented logs track the numbers from day one through final verification.
We adjust drying speed for sensitive materials like hardwood and cabinetry to prevent secondary damage.
The job closes only once moisture readings match the documented dry standard for each material type.
A quick call helps us determine whether thermal imaging and full drying equipment are needed.
A technician arrives with thermal imaging cameras and moisture meters ready to assess.
You'll see the calculated plan and cost before drying equipment goes down.
The job closes only once documented readings confirm the structure is fully dry.

"The thermal imaging found moisture behind a wall that looked completely fine from the outside. Would have missed it otherwise." — Julian R.
"They came back every single day to take readings and showed me the numbers improving. Felt like real science, not guesswork." — Monique T.
"Our hardwood floor didn't warp because they slowed the drying process down specifically for it." — Grant P.
Visual appearance doesn't confirm dryness — instrument readings are needed to catch what's not visible.
It's the technical foundation behind Structural Drying And Dehumidification rather than a marketing term.
Timeline depends on material type and how much moisture the thermal scan revealed.
Daily documentation is standard, giving you real data rather than just an assurance.
Yes, we use slower, controlled drying specifically calibrated for hardwood to prevent warping.
We reassess the plan, since stalled readings usually mean equipment placement or capacity needs adjusting, not just more time.
If your property is in or near Gallagher, a crew can typically respond the same day.

Speak directly with our structural drying team.
Call +1-844-833-1325